Can I do a cost benefit analysis in early stages of the project lifecycle with the Taro RAM simulation tool?

Cost benefit analysis with Taro

Performed early in the refinery design process, Taro helps to identify the bottlenecks of a system and where this system can be optimized. Such an assessment can rapidly feed into a net present value assessment of each option.

Once the development option has been selected, further cost benefit analysis can be performed e.g. examining the benefit of additional installed capacity, or the penalties of reduced redundancy.

Taro, with its logistics modelling features, is the only RAM simulation tool for petrochemical plant process that offers integration of advanced plant-wide reliability simulation and bulk transport logistics. This means that feedstock availability, terminal arrival scheduling and other critical operations dependent on transport reliability, can be assessed and optimized.