POSCO E&C advances optimal-design automation for offshore wind substructures with DNV Sesam

POSCO E&C is a global EPC company strengthening its capabilities in sustainable and future-oriented businesses, including offshore wind, hydrogen and small modular reactors (SMRs), alongside its traditional construction and infrastructure operations. This project aims to use AI to automate structural analysis and optimal-design processes for offshore wind substructures based on DNV Sesam, enabling more design alternatives to be evaluated while improving both structural safety and economic efficiency.

Potential business outcomes identified through the R&D initiative
  • Potential to reduce steel requirements by more than approximately 5%, based on data from previously completed projects 
  • Shorter design periods and improved project execution efficiency 
  • Improved quality and reliability through greater consistency and traceability of design results 
  • A stronger foundation for design, cost and tender competitiveness in offshore wind EPC projects

The opportunity and challenge

Offshore wind substructures involve many design variables, including water depth, ground conditions, loading conditions and structural configuration. As a result, changes in design require structural analysis and design checks to be repeated. Engineers must identify the critical members and governing load conditions from large volumes of analysis results and feed them back into the design, while additional checks such as Pile Check and Fatigue Check further increase the workload and time required. These repetitive tasks have been a constraint on engineering productivity.

Jun Min Lee

We wanted to establish an AI-enabled structural design process that could automate repetitive tasks and allow different design alternatives to be compared quickly. This would enable us to evaluate more alternatives within the same timeframe and ultimately identify optimal designs that meet structural safety requirements.

  • Jun Min Lee
  • Pro, Offshore Wind Business Unit
  • POSCO E&C

Building in-house offshore wind substructure design capability

This objective builds on POSCO E&C’s internal R&D programme to develop in-house offshore wind substructure design capability since 2018. The R&D Center has progressively undertaken integrated load analysis (ILA), BIM library development and automated design technology for jacket structures. It is currently developing AI-enabled optimal-design automation for monopile, three-leg and four-leg jacket structures. 

This technology development is supported by POSCO E&C’s Professional Talent Programme, which systematically develops core technical talent. By connecting key business areas, required technologies and technical experts, and providing dedicated career paths and HR support, the programme creates an environment in which engineers can identify technical challenges and focus on R&D. 

Sun Geun Choi

Even when the offshore wind market was relatively subdued, the Professional Talent Programme and the company’s support enabled us to maintain our focus on technology development. As a result, we were able to develop a system that uses AI to integrate Python programming with Sesam and automate repetitive structural analyses and design modifications.

  • Sun Geun Choi
  • Expert, Technical Research Group
  • POSCO E&C

From technical exchange to a new design approach

The relationship between POSCO E&C and DNV began through industry exchanges and a task force established in 2018 to strengthen offshore wind capabilities. As offshore wind projects expanded and structures and design conditions became more complex, POSCO E&C began exploring how Sesam’s structural analysis capabilities could help overcome the limitations of manual design methods by automating repetitive design activities. Technical exchange with DNV helped turn this concept into a more concrete automation approach. 

In 2023, the two companies signed an MOU to cooperate in the Korean offshore wind sector. They subsequently shared their respective technologies and potential areas of cooperation, continued discussions on AI and BIM, and in 2026 jointly presented an AI-enabled automated optimal-design system for offshore wind substructures at the Korean Wind Energy Association conference. 

Juan Carlos Arévalo

This project is a strong example of how digitalization can turn offshore wind foundation engineering expertise into scalable digital solutions. By connecting AI with engineering tools, it provides a reliable framework for bringing together and applying engineering knowledge that was previously spread across different systems and processes. I believe this marks an important step forward for the future of offshore wind engineering.

  • Juan Carlos Arévalo
  • Executive Vice President of Data and Digital Solutions
  • DNV

Sesam as the core analysis platform in the automated workflow

Sesam serves as the core analysis platform for structural analysis and design verification in this initiative. Key structural design activities, including substructure modelling, load application, structural analysis, member code checking and fatigue assessment, are performed in the Sesam environment. It is used particularly for ULS checks and FLS assessments of monopile and jacket structures. 

POSCO E&C has integrated Sesam’s analysis capabilities with automation technology developed internally using AI. It is currently developing technology to automatically extract and evaluate key results, including Member Check, Pile Check and Fatigue Damage, while also validating the automation of design-variable updates and rerunning the analysis based on those results.

Engineering collaboration beyond software support

DNV has provided POSCO E&C with Sesam training and technical support, while also working with the company to review technical matters arising in offshore wind structural design. The support has helped deepen understanding of Sesam’s analysis processes and data structure, and has provided technical input and feedback during the development of the structural-analysis automation workflow.

Yoon Ok Cho

One of Sesam’s strengths is that the entire process—from modelling and load generation to structural analysis and code checking—can be automated through scripting. The key challenge in applying these capabilities to an offshore wind design process was to combine engineering expertise effectively with automation technology. This enabled a high level of automation and workflow efficiency, while also supporting the continued development of Sesam’s capabilities and workflows.

  • Yoon Ok Cho
  • Principal Engineer
  • DNV
Sun Geun Choi

DNV’s support went beyond explaining how to use the software. We were able to review technical matters arising in actual offshore wind structural design together, which helped us shape the technology development in a direction that could be applied in engineering practice.

  • Sun Geun Choi
  • Expert, Technical Research Group
  • POSCO E&C

Results: how design automation is changing the workflow

Applying automation has significantly reduced the burden of repetitive structural-analysis result reviews and design iterations. This has created a foundation for evaluating more design alternatives within the same timeframe, while allowing engineers to devote more time to design judgement and comparison of alternatives.

Woo Chang Shin

The ability to evaluate more design alternatives is not simply about working faster. By comparing a broader range of options, we can move closer to design optimization that considers both structural safety and economic efficiency.

  • Woo Chang Shin
  • Pro, Offshore Wind Business Unit
  • POSCO E&C

Reverse engineering of jacket and monopile structures from previously completed projects rapidly identified optimized sections indicating a potential reduction in steel requirements of more than approximately 5%. Although this is not a result achieved in a live commercial project, it is a meaningful R&D validation showing how automation can contribute to more economical designs and design optimization.

Connecting people and technology through standardization

Seung Sik Shin

Automation is not intended to replace engineers. It is a means of enabling them to focus on more important technical judgements and decision-making.

  • Seung Sik Shin
  • Vice President of Offshore Wind Business Unit
  • POSCO E&C

Offshore wind structural design requires a high level of expertise and experience. As projects grow in scale and design conditions become more complex, engineering experience and judgement become even more important. 

The purpose of this project is not to reduce the role of engineers, but to automate repetitive tasks so they can focus on more important design judgements and decisions. The time released through automation can be used to evaluate more alternatives and identify solutions that better balance structural safety and economic efficiency. 

Systematizing design processes and decision criteria also enables work that once depended heavily on individual experience to be performed more consistently. This is expected to improve the consistency and traceability of design results while supporting the accumulation of technical knowledge and the strengthening of organizational capability.

The future of digitally enabled offshore wind design

Woo Jae Kim

Our goal is to expand the automation technology currently under development to a wider range of offshore wind substructures, including monopiles and jackets, and to evaluate multiple design alternatives automatically. Ultimately, we aim to build an integrated one-stop design system that can propose an optimal design, perform structural analysis, and generate drawings and quantities.

  • Woo Jae Kim
  • Vice President of Technical Research Group
  • POSCO E&C

POSCO E&C sees this initiative not as a stand-alone technology development project, but as one stage in a long-term journey to build in-house design capability. The next step is to integrate key design checks, including ULS, FLS and soil–structure interaction, within a single automated process and develop an environment in which multiple design alternatives can be automatically generated and evaluated from the specified design conditions. 

This will enable engineers to focus more on technical judgement and decision-making rather than repetitive review work, while responding more quickly to changes in client requirements. By supporting design reviews that consider both structural safety and economic efficiency, the approach is also expected to strengthen design and cost competitiveness in offshore wind EPC projects.


About POSCO E&C

Established in 1982, POSCO E&C is a comprehensive engineering company that has grown alongside Korea’s industrial development. In 2023, the company changed its name to reflect its Eco & Challenge vision of building an environmentally sustainable future, and is actively expanding into renewable energy and sustainable future businesses, including offshore wind, hydrogen and SMRs. 

In offshore wind, POSCO E&C is strengthening the cost and quality competitiveness of substructures by leveraging high-quality steel products from the POSCO Group. It is also expanding its offshore wind business in Korea and overseas by building comprehensive EPC capabilities spanning wind-farm design, subsea cables and onshore substations.

Profile

  • Customer: POSCO E&C 
  • Website: www.poscoenc.com 
  • Market: Construction, Infrastructure and Energy 
  • Focus area: Offshore wind 
  • Product: Sesam
Jong Moon Choi

The greatest value is created when reliable structural analysis technology, engineering experience and automation come together. This project, combining POSCO E&C’s engineering capabilities with DNV Sesam, has been a meaningful demonstration of the potential of offshore wind design automation. We plan to continue building on this collaboration to strengthen our design competitiveness.

  • Jong Moon Choi
  • Senior Vice President of R&D Center
  • POSCO E&C