From coal to renewables – lessons to learn from a total transformation
Featuring in this interview
Francesco Bellusci, MD of Scorpio Ship Management sam
Graduated in Naval Architecture and Marine Engineer “cum laude”, Mr. Bellusci was Technical Director in Scorpio from 1995, DPA from 1997 and was appointed General Manager in 2008 and Managing Director from 2010. A high level of competence, strong motivation and an innate passion for the sea have guided his career development within Scorpio, a company with a solid base that allows him daily to carry out his responsibilities ethically and effectively, safeguarding the environment and contributing to the development of a sustainable world. The success of Scorpio Tankers and the transition from dry bulk to WTIV would not have happened without a solid industrial plan where the vision of Francesco on ship efficiency and emissions regulatory challenges was instrumental.
Get regular industry insights!
Don’t be left out. Join the 50,000 active subscribers and sign up today to receive the latest insights.
Sign up