The objective of the NorMoor JIP is to propose a mooring design code with a consistent analysis methodology and with safety factors (SF) that are in line with this methodology and calibrated at an appropriate target reliability level. The present report is a summary of the work performed in the NorMoor JIP Phase 3 on the fatigue limit state, FLS, considering tension-tension fatigue of mooring systems.