Skip to content

A long term utility experience with Smart Cable Guard

Presented by Alliander at the 24th International Conference on Electricity Distribution (CIRED) from 12-15 June 2017 in Glasgow, UK as paper 0546

Request a copy

Download our paper, please fill out this form

In recent years, Alliander (one of the largest network owners in the Netherlands with almost 40 000 km of MV cable (PILC and XLPE) installed a number of Smart Cable Guard (SCG) systems to verify its effectiveness in preventing failures or, if there is a breakdown, to reduce the repair time (outage time). Alliander concluded that SCG is indeed a very effective tool for on-line detection and location of (intermittent) faults and PD’s in MV power cables. These phenomena are located with an inaccuracy better than 1%, based on travelling waves.
On average, each SCG system could have prevented about 6150 customer minutes lost per year. Preventive repair also allows to see the cause of degradation, helping to develop counter measures. SCG can be used in all types of MV cable networks and replaces Fault Passage Indicators as well. Based on this, Alliander will implement more SCG systems in the upcoming years.