Joint industry project

Subsea Integrity Management (SIM) phase 3

Call for partners

Over 12 years of industry collaboration on subsea integrity management

A changing subsea landscape brings new integrity challenges

Over the past decade, the subsea industry has entered a period in which technology advancement and asset ageing are occurring simultaneously. Subsea systems are evolving beyond conventional production architectures, with increasing application of subsea processing and electrification, including electrically powered and actuated subsea equipment. At the same time, a significant portion of the existing subsea infrastructure is ageing, with facilities approaching or operating beyond their original design life. 

These developments introduce new and evolving integrity management challenges. Subsea processing and electrification bring additional equipment, new interfaces, failure modes and technology-specific integrity considerations, while ageing facilities require increased attention to degradation, reliability, obsolescence, maintainability and continued fitness for service. In parallel, subsea technologies and infrastructure are being extended to emerging applications such as CCUS injection and storage, and offshore wind, further broadening the range of operating conditions, technologies and integrity considerations to be addressed.

Evolving subsea integrity management for what comes next

Subsea Integrity Management (SIM) is a multi-phase joint industry project (JIP) that develops guidance for operators in addition to suppliers and survey/consulting companies on establishing and maintaining an integrity management system (IMS) for subsea production systems. It promotes a consistent approach to integrity management within and across operator organizations. Phases 1 and 2 focused on developing guidelines and a recommended practice for managing the integrity of established equipment, drawing on industry experience and best practices.

Based on recent industry, the phase 3 of the SIM joint industry project will aim to update DNV-RP-0002 to reflect subsea industry landscape. Emphasis will be placed on subsea processing and electrically driven systems, the life extension and integrity management of ageing subsea facilities throughout extended service life, and emerging applications.

Phase 3 of the JIP will focus on the following: 

Subsea processing and electrically driven systems 

Extend integrity management guidance to address subsea processing systems and increasing electrification of subsea systems and equipment, including:

  • Subsea compression and pumping
  • Subsea control system
  • Subsea electrical cable
  • Electrically driven trees, valve, eSCMs etc. 

Ageing management and life extension

Develop guidance for life extension of ageing subsea facilities, including:

  • Develop a structured life-extension methodology and assessment process
  • Address integrity management requirements and considerations for assets operating through extended service life
  • Address ageing-related aspects such as degradation, reliability, obsolescence, maintainability and continued fitness for service

CCUS  injection and storage

Extend integrity management guidance to address CCUS/CO₂ injection and storage, including service-specific integrity threats and relevant subsea systems and equipment, such as:

  • Subsea wellheads
  • Christmas trees
  • Manifolds
  • PLEM etc.

Data management and digital enablement

Strengthen the use of data and digital technologies in support of subsea integrity management, including:

  • Improve data management, quality and accessibility throughout the asset lifecycle
  • Evaluate practical digital-twin applications for condition assessment, integrity decision-making and lifecycle management

What phase 3 will enable

Building on phases 1 and 2, phase 3 will:

  • Strengthen guidance for the integrity management and life extension of ageing subsea facilities
  • Extend the applicability of DNV-RP-0002 to reflect the evolving subsea industry landscape, with particular emphasis on subsea processing and electrification, CCUS injection and storage including relevant new and emerging subsea systems and equipment
  • Consider data management and practical digital-twin applications in support of integrity management
  • The overall objective is to develop industry-aligned recommendations for updating DNV-RP-0002, supporting a consistent, risk-based and lifecycle-oriented approach to subsea integrity management across existing, evolving and emerging applications

What the JIP will deliver

The final delivery will be a summary report giving an overview of the work performed including the JIP recommendations. 

The results from the JIP will be used in forthcoming updates of an existing DNV recommended practice (DNV-RP-0002). 

Help shape the future of subsea integrity management

As a participant in the SIM phase 3 JIP you will be able to: 

  • Share operational experience and lessons learned to shape integrity management recommendations grounded in field practice
  • Help shape future guidance on life extension for ageing subsea assets
  • Influence future guidance on integrity management for CCS/CO2 injection systems, and additional systems and equipment 
  • Collaborate with operators, suppliers and industry peers on a consistent, risk-based lifecycle approach to subsea integrity
SIM phase 3

Join the JIP!

If you have questions about the JIP plans or would like to discuss the scope for the SIM JIP initiatives, please reach out to us.

Other joint industry projects