Where does wind power fit into shipping’s green technology solution space?
Wind assisted propulsion systems (WAPS) are among the promising green technologies helping shipping to decarbonize. Host Eirik Nyhus is joined by WAPS specialist Johanna Tranell to discuss this technology’s potential, important operational and design considerations, its performance measurement and how it can help to deal with current environmental regulations.
Where does wind power fit into shipping’s green technology solution space?
Wind assisted propulsion systems (WAPS) are among the promising green technologies helping shipping to decarbonize. Host Eirik Nyhus is joined by WAPS specialist Johanna Tranell to discuss this technology’s potential, important operational and design considerations, its performance measurement and how it can help to deal with current environmental regulations.
-
Wind Assisted Propulsion Systems
Read more about our WAPS-related services
-
Maritime Forecast to 2050
Get more insights on the potential of wind to drive decarbonization
-
FuelEU Maritime
Learn more on how to comply
-
Transcript of the podcast
Download and read the transcript of the podcast
-
Apple podcast
Listen to the podcast on Apple
-
Spotify
Listen to the podcast on Spotify
Get regular industry insights!
Join the thousands of industry leaders today who have already signed up to receive the latest insights.
sign up