How SAL and DNV are strengthening heavy-lift shipping

From classification and newbuilding support to operational tools and advisory expertise, SAL and DNV have been collaborating for decades. The partnership supports both the development of SAL’s Orca Class vessels and day-to-day operations, including more efficient cargo planning using DNV’s Route-Specific Cargo Calculator.

With a current fleet of 22 DNV-classed heavy-lift vessels, SAL Heavy Lift is a leader in the segment. The Harren Group company’s latest newbuilding programme has set a new benchmark for performance, operational flexibility, and efficiency. Three of a series of five 14,600 dwt Orca Class ships have been delivered so far. SAL is discussing additional newbuilds of the same type with Wuhu Shipyard in China.

“Our long-standing collaboration with SAL and Harren Group has covered many different aspects of their fleet,” says Jost Bergmann, Business Director MPV & General Cargo Ships at DNV. Bergmann, who supports SAL’s newbuilding programme for DNV, recently attended the christening of MV Patricia, the third vessel in the series, in Rostock. “The Orca vessels stand out in several respects, both in their design and in how they are intended to support SAL’s operations.”

Heavy-lift vessel design built on decades of operational experience

The design of SAL’s Orca Class heavy-lift vessels draws on decades of experience in project cargo shipping with a focus on the most demanding cargoes. Developed by SAL’s in-house ship engineering team, the basic design combines the company’s shipbuilding expertise with lessons from operating heavy-lift vessels and transporting complex and oversized cargo.

The optimized hull form supports good seakeeping and helps limit acceleration forces acting on the cargo, which can reduce lashing requirements. A forward deck house protects deck cargo from the elements while enabling long cargo, such as wind turbine blades, to extend beyond the stern.

Flexible cargo handling for oversized project cargo

Cargo flexibility was also a priority. The vessels’ high freeboard helps protect cargo from water, while DNV’s Hatchcoverless class notation allows oversized cargo to be transported in the open hold. A box-shaped single cargo hold and hatch covers designed for loads of up to 10 tonnes per square metre provide additional options for positioning heavy and oversized project cargo.  

One of SAL’s Orca class heavy-lift newbuilds at the Whuhu Shipyard in China.

 

SAL’s requirements for loading flexibility were considered during the design process. DNV’s class-independent Maritime Advisory experts carried out global structural analyses using the vessels’ three-dimensional finite element model to validate these requirements and develop recommendations for optimizing the design.

This combination of vessel design and structural analysis supports the operational flexibility required for complex heavy-lift and project cargo. The Orca Class vessels also have a high ice class rating of 1A and Polar Code certification for operations requiring particular care in low ambient temperatures.

Electric cranes and flexible propulsion for heavy-lift shipping

The vessels combine their cargo capabilities with new crane, energy management, and propulsion technologies. Two fully electric Liebherr Maritime LS 800 E cranes, each with a lifting capacity of 800 tonnes, provide a combined lifting capacity of up to 1,600 tonnes in tandem operation. Using electric rather than hydraulic cranes also eliminates the risk of hydraulic oil escaping from the crane system.

A hybrid energy management system combines gensets with lithium-titanium-oxide batteries to optimize energy use. Shore power capability allows the vessels to operate without on-board emissions when suitable infrastructure is available in port.

Methanol-ready propulsion for greater fuel flexibility

The Orca Class also features a dual-engine concept designed for different operating profiles. One engine supports normal cruising, while the second main engine can provide additional power through the gearbox when required, enabling speeds of up to 18.5 knots for time-critical cargo deliveries.

The vessels are designed to be methanol-ready, except for the tanks, allowing conversion for operation with green methanol. Safety and accessibility are also integrated into the design, with stairs providing access to walkways, entrances, accommodation, work areas, and cargo areas.

Operational excellence supported by DNV

The cooperation between SAL’s parent company Harren Group and DNV extends beyond newbuilding projects. For vessels in operation, Harren Group draws on DNV’s digital class services, software, and class-independent Advisory expertise to support day-to-day fleet management and address technical challenges. My Services on Veracity, for example, gives superintendents and inspectors a central overview of their vessels, helping them monitor the fleet, plan upcoming activities, and arrange surveys easily. Integrated port state control guidance, including relevant checklists and authority focus areas, also helps crews prepare vessels for inspections and smoother port stays.

The state-of-the-art bridge of an Orca vessel provides a comprehensive overview of all processes, from navigation to the deck and cargo.

 

Jan-Hendrik Dammann, Fleet Manager, Harren Shipping Services GmbH & Co. KG, confirms: “DNV’s digital solutions, especially My Services on Veracity, are the benchmark in the market and a real asset in our day-to-day work. For our ships in service, DNV is a partner we can rely on.”

The cooperation also gives Harren Group access to DATE (Direct Access to Technical Experts), connecting the company directly with DNV experts when technical questions arise.

“We’ve been partners with DNV for a long time, and what we value most is the quality of support and service we receive, online and in person,” highlights Dammann. “We can reach the right experts when needed, and our requests are handled quickly and competently. This close and straightforward cooperation means we usually find joint solutions that are practical and work for both sides.”

DNV’s Route-Specific Cargo Calculator delivers solid monetary benefits

Carrying extremely heavy or oversized project cargoes comes with stowage restrictions and sea-fastening challenges. Securing breakbulk cargo on board in compliance with the IMO Code of Safe Practice for Cargo Stowage and Securing (CSS Code) requires engineering expertise as well as costly sea-fastening equipment and often comes with considerable efforts for deck reinforcements.

Intended to predict the acceleration forces acting on the cargo during transit, the CSS Code assumes the harsh conditions in the North Atlantic, and uses standardized ship contours. But for trips in much more benign sea areas, these rules are overly conservative. While calculating the more realistic accelerations along a given route takes expert knowledge, DNV’s Route-Specific Cargo Calculator tool on Veracity provides a convenient, user-friendly way for cargo planners to predict the acceleration forces during the relevant season without requiring engineering skills.

Increased stowage flexibility and capacity utilization

SAL is using the tool more and more, says Karsten Behrens, Managing Director at SAL Engineering. “It gives us greater stowage flexibility compared to the CSS Code, for example in matching the vessel with the cargo or placing cargo on the weather deck. It also reduces the lashing effort and expense. These effects can multiply when identical cargo is transported along the same route repeatedly.”

In one case, the tool helped SAL make better use of the available space on board by calculating a reduced route- and season-specific maximum transverse acceleration of 3.95 m/s2, which is roughly 75 per cent of the assumed value according to the CSS Code of 5.23 m/s2. The resulting reduction of deck loads allowed 15 to 20 per cent more cargo to be transported on that voyage. “In some cases the DNV tool allows us to accept a particular shipping order; in other cases, it reduces the number of trips we must take,” says Behrens. “This is in the best interests of both the cargo owner and the ship operator.”

Stored digital ship model reduces lashing time and effort

The Route-Specific Cargo Calculator uses a digital model of the ship that has to be entered into DNV’s Veracity system only once. All the user has to enter for a specific trip are some loading condition parameters like draft, trim, and metacentric height (GM), the stowage positions of cargo items, plus the route and, optionally, the season. The tool uses its database of route-specific sea states to return realistic acceleration values.

“While we could calculate these values ourselves at SAL Engineering,” remarks Behrens, “the DNV tool reduces the effort and speeds up the process, freeing up our resources for other purposes.”

Another typical use case is transporting wind turbine components from the U.S. East Coast to Mexico. The CSS Code would require extensive lashing, but sailing this route during the summer season reduces the lashing requirement by about 50 per cent.

RSCC unlocks operational potential and strengthens risk management

“The DNV tool helps open up untapped potential,” explains Behrens. “What is more, even in the North Atlantic in winter, when we operate under the most severe conditions, the tool gives us reassurance that the sea-fastening and loading measures we take are on the safe side. For shipments with our newbuild MV Elise, we not only knew that we were on the safe side, but the tool even told us how far.”

Adrian Kahl
Contact us

Adrian Kahl

Principal Engineer Structures

  • DNV
  • SAL Engineering GmbH