Skip to content

ERS™ drawings requirements

24/7 shore-based damage control support to ships and offshore units via residual buoyancy, stability, strength, and drift predictions

For the enrolment and the service thereafter the following drawings are required and used

Ships and ship shaped offshore units

  • Lines plan or offset table
  • General arrangement
  • Tank and capacity plan
  • Midship section
  • Shell expansion plan
  • Construction profile and decks
  • Fore end construction / fore peak
  • Cargo area construction
  • Engine room construction
  • Aft end construction/aft peak
  • Final trim and stability booklet
  • Loading manual
  • Loading computer test loading conditions
  • Rudder and rudder stock
  • Steering gear
  • Emergency towing arrangement/booklet
  • Damage control plan/booklet
  • Piping Plans of ballast and fuel oil systems
  • Docking plan drawing
  • Container Stowage Arrangement for container carriers and vessels equipped for carriage of containers 

Semi-submersible offshore units

  • Lines plan
  • General arrangement
  • Tank and capacity plan
  • Design load plan
  • Free board plan
  • Damage control plan
  • Fire control /safety plan
  • Watertight integrity plan
  • Doors and hatches arrangement
  • Ventilation arrangement
  • Final stability analysis/booklet
  • Final/latest operation manual
  • Latest light-unit weight data
  • Loading computer printout of one (random) loading condition
  • Copy of one daily stability report
  • Main structure pontoons construction overview
  • Main structure pontoons general arrangement
  • Main structure pontoons longitudinal sections
  • Main Structure Pontoons Transverse Sections and Bulkheads
  • Main structure pontoons shell expansion
  • Main structure columns construction overview
  • Main structure columns general arrangement
  • Main structure columns cross sections
  • Main structure columns shell expansion
  • Main structure columns platforms and bulkheads
  • Main structure deck construction overview
  • Main structure deck box general arrangement
  • Main structure deck box construction
  • Main structure bracing local arrangement plan
  • Main structure bracing construction
  • Mooring arrangement plan
  • Mooring system description
  • Towing arrangement plan/system
  • Ballast system arrangement plan
  • Ballast system diagram (P&ID)
  • Ballast system operation description
  • Ballast system control and monitoring functional description
  • Sea water cooling system
  • Bilge system outline
  • Bilge system operation description
  • Draughts and Load Line marks

Jack Up units and vessels

  • Lines plan
  • General arrangement / overall plan
  • Tank and capacity plan/layout
  • Design load plan
  • Free board plan
  • Fire control /safety plan
  • Watertight compartmentation
  • Doors and hatches arrangement
  • Hull ventilation diagram
  • Final (afloat) stability booklet
  • Latest lightship weight data
  • Loading conditions report
  • Marine operation manual
  • Legs structure
  • Legs arrangement
  • Legs spud can arrangement
  • Legs spud can structure
  • Main hull longitudinal bulkheads
  • Main hull transverse bulkheads
  • Main hull transverse frames
  • Main hull scantling elevation side shell
  • Main deck plating
  • Bottom plating
  • Cantilever arrangement plan
  • Cantilever structural drawings
  • Deck house arrangement plan
  • Deck house construction
  • Jacking foundation structural plan
  • Jacking foundation arrangement
  • Mooring arrangement plan
  • Towing arrangement plan
  • Ballast system arrangement plan
  • Ballast system diagram (P&ID)
  • Ballast system operation description
  • Sea chest arrangement
  • Bilge system outline
  • Bilge system operation description
  • Hull marking
For special purpose ship types and for vessels with specific designs, additional drawings may be required. Contact us for details.
5/25/2022 10:29:49 AM