For the enrolment and the service thereafter the following drawings are required and used

Ships and ship shaped offshore units

  • Lines plan or offset table
  • General arrangement
  • Tank and capacity plan
  • Midship section
  • Shell expansion plan
  • Construction profile and decks
  • Fore end construction / fore peak
  • Cargo area construction
  • Engine room construction
  • Aft end construction/aft peak
  • Final trim and stability booklet
  • Loading manual
  • Loading computer test loading conditions
  • Rudder and rudder stock
  • Steering gear
  • Emergency towing arrangement/booklet
  • Damage control plan/booklet
  • Piping Plans of ballast and fuel oil systems
  • Docking plan drawing
  • Container Stowage Arrangement for container carriers and vessels equipped for carriage of containers 

Semi-submersible offshore units

  • Lines plan
  • General arrangement
  • Tank and capacity plan
  • Design load plan
  • Free board plan
  • Damage control plan
  • Fire control /safety plan
  • Watertight integrity plan
  • Doors and hatches arrangement
  • Ventilation arrangement
  • Final stability analysis/booklet
  • Final/latest operation manual
  • Latest light-unit weight data
  • Loading computer printout of one (random) loading condition
  • Copy of one daily stability report
  • Main structure pontoons construction overview
  • Main structure pontoons general arrangement
  • Main structure pontoons longitudinal sections
  • Main Structure Pontoons Transverse Sections and Bulkheads
  • Main structure pontoons shell expansion
  • Main structure columns construction overview
  • Main structure columns general arrangement
  • Main structure columns cross sections
  • Main structure columns shell expansion
  • Main structure columns platforms and bulkheads
  • Main structure deck construction overview
  • Main structure deck box general arrangement
  • Main structure deck box construction
  • Main structure bracing local arrangement plan
  • Main structure bracing construction
  • Mooring arrangement plan
  • Mooring system description
  • Towing arrangement plan/system
  • Ballast system arrangement plan
  • Ballast system diagram (P&ID)
  • Ballast system operation description
  • Ballast system control and monitoring functional description
  • Sea water cooling system
  • Bilge system outline
  • Bilge system operation description
  • Draughts and Load Line marks

Jack Up units and vessels

  • Lines plan
  • General arrangement / overall plan
  • Tank and capacity plan/layout
  • Design load plan
  • Free board plan
  • Fire control /safety plan
  • Watertight compartmentation
  • Doors and hatches arrangement
  • Hull ventilation diagram
  • Final (afloat) stability booklet
  • Latest lightship weight data
  • Loading conditions report
  • Marine operation manual
  • Legs structure
  • Legs arrangement
  • Legs spud can arrangement
  • Legs spud can structure
  • Main hull longitudinal bulkheads
  • Main hull transverse bulkheads
  • Main hull transverse frames
  • Main hull scantling elevation side shell
  • Main deck plating
  • Bottom plating
  • Cantilever arrangement plan
  • Cantilever structural drawings
  • Deck house arrangement plan
  • Deck house construction
  • Jacking foundation structural plan
  • Jacking foundation arrangement
  • Mooring arrangement plan
  • Towing arrangement plan
  • Ballast system arrangement plan
  • Ballast system diagram (P&ID)
  • Ballast system operation description
  • Sea chest arrangement
  • Bilge system outline
  • Bilge system operation description
  • Hull marking
For special purpose ship types and for vessels with specific designs, additional drawings may be required. Contact us for details.