Concrete for Floating Offshore Wind (FOW)

Joint Industry Project

Concrete for floating offshore wind

Contact us:

Tim Wiley

Tim Wiley

Principal Engineer

Concrete for Floating Offshore Wind (FOW): Invitation for parties to join in the discussion

EXPRESS YOUR INTEREST

DNV is looking for partners to launch a new Joint Industry Project to enhance technology development and prepare for scale/industrialization of concrete substructures for floating offshore wind (FOW).

Objective

The objective is to gain knowledge on topics specific to concrete floaters to further develop DNV standards. DNVGL-ST-0119 includes design provisions for concrete floaters; however, some of the requirements draw from Oil & Gas experience, and some draw from experience with bottom fixed wind farms.

The requirements should be further refined, optimized, and aligned for floating offshore wind developments. Two or three “hot topics” will be investigated as work packages.

The results of this JIP will be used to update the concrete design provisions in DNV-ST-0119.

Why

In the last ST-0119 external hearing, several comments related to the concrete design provisions were received from the industry. For concrete floaters, there are special topics (i.e. leak tightness) that may govern the design of the floater. Concrete structures are designed to crack, but the extent of cracking (width & depth + duration) should be controlled to maintain floatability and ensure long term durability.

For FOW and larger turbine sizes, DNV sees that concrete floaters are an attractive alternative to steel floaters from cost and carbon footprint comparisons. Improvements to the design provisions should further enable more efficient use of materials whilst maintaining the historically robust performance of offshore concrete structures.

Participation

DNV has to date discussed the JIP initiative with more than 20 companies and we expect to soon reach our funding goal to launch the JIP.  A call for more interested partners remains open, and we welcome more companies spanning various interests (operators, designers, contractors, regulators).  

We plan to carry out the JIP over a period of 1.5 years, starting earliest Q3/2022.

Partners in the JIP will participate in scoping workshops, receive early access to knowledge gained, and have insight to the revised design provisions.