Project+Portfolio
Contact us by e-mail
Fax: +47 6757 9911
(Att: M. Lehmann)
Your comment is important! However, please be aware that Det Norske Veritas as a DOE
is not obliged to answer any comments directly, as we cannot answer on behalf of the project proponent.
Our final validation report will reflect how we have taken due account of your comment,
as outlined in decision 17.CP7, §40.f of the modalities and procedures for the CDM
(contained in the Marrakech accords, add. 2)
 
Country: 
Page 1 of 185
Open for Com.
Country
Project Name
Description
Open China Huadian Kulun 201MW wind farm project - Gold Standard Huadian Kulun 201MW wind farm project (hereafter refer as “the proposed project”) will be developed by Inner Mongolia Huadian Huitengxile Wind Power Co., Ltd. The proposed project will be located in Kulun town, Wulan Chabu city, Inner Mongolia Autonomous Region in China and involves a installation of 134 turbines, each of which has a rated output of 1500kW, providing a total capacity of 201MW. The annual net output of the proposed project is estimated to be 496,530MWh. The electricity to be generated will be delivered to North China Power Grid through Inner Mongolia Grid. This project also applies for registration as Gold Standard project. This 60 days stakeholder consultation is to meet the requirements of the Gold Standard. Project documentation to be found on Gold Standards website: https://gs1.apx.com/mymodule/ProjectDoc/EditProjectDoc.asp?id1=557
Closed China Huadian Hebei Guyuan 100.5MW Wind Farm Project - Gold Standard. Huadian Hebei Guyuan 100.5MW Wind Farm Project (hereinafter referred to as “the proposed project”) is located in Guyuan County, Zhangjiakou City, Hebei Province. The primary objective of the proposed project is to generate renewable electricity to meet the ever-increasing demand in the North China Grid (NCG).The proposed project will install 67 wind turbine units manufactured by Sinovel Wind Co., Ltd at the proposed project site, with a capacity of 1500 kW per unit. Based on the conditions of the local wind resource, the proposed project is expected to supply 227,300MWh electricity annually to NCG. Without the proposed project, this electricity demand will still be satisfied by NCG through installing new capacities or uploading existing capacities, which are dominated by fuel-fired generators. Thus, the baseline scenario, also the scenario before the proposed project, is the following: Equivalent electricity service provided by NCG.
Closed Poland N2O emissions reduction project at Zak³ady Azotowe Anwil S.A. By installing a secondary N2O abatement catalyst underneath the ammonia oxidation catalyst in the ammonia oxidation burners, the generated N2O during oxidation of ammonia will be decomposed into nitrogen and oxygen. The installed technology will according to suppliers allow more than 70% reduction of the N2O content in the tail gas. At present the N2O is emitted to the atmosphere, hence the project results in reductions of N2O emissions that are real, measurable and give long-term benefits to the mitigation of climate change. The project follows the JI Track 1 with Poland's National Procedures.
Closed India 2.25 MW Wind Power Project in Southern India The purpose of this project activity is to generate electrical power using wind energy, through operation of wind turbines in Tamilnadu state of India. The project activity comprises of 7 wind turbines installed at two locations (Metrathi and Molarapatty villages) in Udumalpet Taluk of Coimbatore district and Dharampur Taluk of Erode District of Tamilnadu, India. The electricity generated from this project activity is supplied to the southern regional electricity grid of India using state transmission lines. The installed power generation capacity in the project activity is 2.25 MW. The project is expected to reduce 3817 t CO2 emissions per annum.
Closed China Huadian Tongliao Beiqinghe 300 MW Wind Farm Project The Huadian Tongliao Beiqinghe 300 MW Wind Farm Project is located in Kailu Country, Tongliao City, Inner Mongolia Autonomous Region and the primary objective is to generated renewable electricity to be supplied to the Notheast China Grid. The PDD is applying for CDM registration (see PDD published for the 30 days stakeholder consultation required for the CDM http://cdm.unfccc.int/Projects/Validation/DB/YU5TJZ452HE4Q4LMAHN9Q7ADTQU9FY/view.html) and also applies for registration as Gold Standard project. This 60 days stakeholder consultation is to meet the requirements of the Gold Standard.
Closed China Liaoning Changtu Taiyangshan Phase One 49.5 MW Wind Farm Project The Liaoning Changtu Taiyangshan Phase One 49.5 MW Wind Farm Project is located in the Liaoning Province and the primary objective is to generated renewable electricity to be supplied to the Notheast China Grid. The PDD is applying for CDM registration (see PDD published for the 30 days stakeholder consultation required for the CDM http://cdm.unfccc.int/Projects/Validation/DB/K6COT99NAM1T6L8T1ZLUFULMUW5UIK/view.html) and also applies for registration as Gold Standard project. This 60 days stakeholder consultation is to meet the requirements of the Gold Standard.
Closed China Huadian Kailu Yihetala Phase one 49.5 MW Wind Farm Project The Huadian Kailu Yihetala Phase one 49.5 MW Wind Farm Project is located in the Inner Mongolia Autonomous Region and the primary objective is to generated renewable electricity to be supplied to the Notheast China Grid. The PDD is applying for CDM registration (see PDD published for the 30 days stakeholder consultation required for the CDM http://cdm.unfccc.int/Projects/Validation/DB/JZZGUFSF5TD7WEBA0B6B8UO96K7RJ6/view.html) and also applies for registration as Gold Standard project. This 60 days stakeholder consultation is to meet the requirements of the Gold Standard.
Closed Canada Fredericton Region Solid Waste Commission (FRSWC) Landfill Gas Capture and Flare Project The purpose of the Project is to capture and flare landfill gas containing methane, thus significantly reducing the global warming potential of the greenhouse gases released to the atmosphere.
Closed India Grid connected bundled wind based renewable energy project in Maharashtra, India The proposed project activity is a bundled wind power project with an installed capacity of 43.75 MW. The project is located in the state of Maharashtra, at Sangli, Nandurbar and Dhule districts, India. The project applies ACM0002, version 07 and is expected to generate an estimated GHG emission reduction of 690,660tCO2e over the fixed crediting period of 10 years.
Closed Indonesia ID08-WWP-11, Methane Recovery in Wastewater Treatment, Jambi, Indonesia, PKS PT Sumbertama Nusapertiwi (ID-0832WWP) is a palm oil mill with a processing capacity of 30 tonnes per hour. This facility processes approximately 93,006 tonnes of Fresh Fruit Bunches (FFBs) per year. This project will recover methane caused by the decay of biogenic matter in the effluent stream of an existing palm oil processing mill by introducing methane recovery and combustion to the existing anaerobic effluent treatment system (lagoons). implementation of the project activity will result in emission reduction of 14,831 tCO2e per annum over a renewable crediting period of seven years